8/2009

Wastewater Plant Biological Nutrient Reduction Upgrade

Completion Spring 2011

Wastewater Plant upgrade to reduce Total Nitrogen and Phosphates to meet the Chesapeake Bay Tributary regulations.

Cost: $11,000,000.00

Authority Funds; $6,700,000.00

Grants; $4,300,000.00


11/2009

Water Meter Replacement

Completed Fall of 2010

Replacement of all Residential water meter and install AMR radio meter reading technology

Cost: $1,043,000.00


6/2009

Penn DOT SR0072-024 Five Points Project

Completed Fall 2010

Replace and Install 1400 ft of new water lines, repair 330 ft of sanitary sewer pipe. Replacement of valves and install new hydrants.

Cost: $450,000.00

Authority Funds; $225,000.00

Penn DOT;$225,000.00


2/2011

Penn DOT SR0072-038 South Main Street

Completed- April 2012

Replace and Install sections of water main, repair and replace manhole lids and frames. Replacement of valves and install new hydrants.

Cost:$55,000.00

Authority Funds;$55,000.00

Penn DOT;$3,600.00


3/2012

Manheim Borough Authority Rettew Lane Bridge Replacement

Project start Spring 2012

Relocation and replacement of the Rettew Lane Bridge

Cost: $ 1,200,000.00

Authority Funds: 100%


7/17/14

Water Tank Maintenance

July 2014

Maintaining and preserving our infrastructure.